- GB50930-2013冷轧带钢工厂设计规范(英文版)
- 中华人民共和国住房和城乡建设部
- 65字
- 2021-03-31 18:23:33
4.6 Workshop Transportation
4.6.1 The coil transportation between processes should be conducted by means of on-line walking beam,transportation chain and coil car.
4.6.2 The replaced roll should be transported directly to the roll shop.
4.6.3 The head and tail croppings and scraps from side trimmer should be directly delivered out of plant after collection and the transportation trucks should not enter the workshop.