4 Process and Equipment

4.1 General Requirement

4.1.1 Determination of production process and selection of operation equipment shall be conducted through techno-economical comparison with respect to the production scale,product mix,production method,characteristics of raw material and fuel,and plant construction conditions,etc.

4.1.2 The auxiliary facility shall meet the production requirements.