- GB/T51075-2015选矿机械设备工程安装规范(英文版)
- 中国冶金建设协会
- 5字
- 2021-04-04 23:44:54
5 Equipment and Material Approach
5.1 General Requirement
5.1.1 This chapter is applicable to equipment and material approach.
5.1.2 The contractor shall prepare a scheme of equipment and material approach and organize the equipment and material approach orderly.